Termite Treatment

PRE CONSTRUTION ANTI-TERMITE TREATMENT
This is done to make an entry barrier to termite attack and is carried our in 3 stages viz.
Treatment to the foundation pits.
Treatment to the wall and floor junctions and in plinth area
Treatment to the external perimeter
This treatment carries 10 years warranty
POST CONSTRUTION ANTI- TERMITE TREATMENT

This treatment is carried out to eradicate the existing termite infestation in the buildings.
Drilling floor at One Feet interval then Tremol Treatment is carried out later holes are covered by white cement.
b) Termol Treatment at the wall and floor junctions & External perimeter. This treatment carries 5 years warranty.

